1. Operations Research approach is ______________.
multi-disciplinary
scientific
intuitive
collect essential data
Correct answer: (A) multi-disciplinary
2. A feasible solution to a linear programming problem ______________.
must satisfy all the constraints of the problem simultaneously
need not satisfy all of the constraints, only some of them
must be a corner point of the feasible region.
must optimize the value of the objective function
Correct answer: (A) must satisfy all the constraints of the problem simultaneously
3. If any value in XB column of final simplex table is negative, then the solution is ______________.
infeasible
infeasible
bounded
no solution
Correct answer: (B) infeasible
4. For any primal problem and its dual______________.
optimal value of objective function is same
dual will have an optimal solution iff primal does too
primal will have an optimal solution iff dual does too
both primal and dual cannot be infeasible
Correct answer: (C) primal will have an optimal solution iff dual does too
5. The difference between total float and head event slack is ______________
free float
independent float
interference float
linear float
Correct answer: (A) free float
6. An optimal assignment requires that the maximum number of lines which can be drawn through squares with zero opportunity cost should be equal to the number of ______________.
rows or columns
rows and columns.
rows+columns- 1
rows-columns.
Correct answer: (A) rows or columns
7. To proceed with the Modified Distribution method algorithm for solving an transportation problem, the number of dummy allocations need to be added are______________.
n
n-1
2n-1
n-2
Correct answer: (B) n-1
8. Select the correct statement
EOQ is that quantity at which price paid by the buyer is minimum
If annual demand doubles with all other parameters remaining constant, the Economic Order Quantity is doubled
Total ordering cost equals holding cost
Stock out cost is never permitted
Correct answer: (C) Total ordering cost equals holding cost
9. Service mechanism in a queuing system is characterized by ______________.
customers behavior
servers behavior
customers in the system
server in the system
Correct answer: (B) servers behavior
10. The objective of network analysis is to______________.
minimize total project duration
minimize toal project cost
minimize production delays, interruption and conflicts
maximize total project duration
Correct answer: (A) minimize total project duration