81. Critical information for top management is provided by ______________ information system.
82. Decision varies as to the ______________ structure within each level of management.
83. ______________ sub system covers granting of credit and cost management
84. The project team is composed of the system professional are directly responsible for ______________ the system
85. ______________ type of testing ensures the system is free of errors and is ready to be placed into operation.
86. GB in memory stands for ______________.
87. Primary storage device such as semiconductor memory chips are called ______________.
88. ______________ will produce the periodic financial statements and reports of the business.
89. ______________ system can process data that are incomplete
90. In network the different communication are interconnected by using a communication processors called a ______________.