141. Which of the following is correct?
- Re-order quantity in a fixed order-interval system equals EOQ
- Review period of the item is always kept higher than its lead time
- Re-order level of an item is always more than its minimum stock
- Buffer stock is the total stock kept to meet the demand during lead time
Correct answer: (C)
Re-order level of an item is always more than its minimum stock
142. The group replacement policy is suitable for identical low cost items which are likely to ______________.
- fail suddenly
- fail completely and suddenly
- fail over a period of time
- be progressive and retrogressive
Correct answer: (C)
fail over a period of time
143. Identify the correct statement
- an assignment problem may require the introduction of both dummy row and dummy column
- an assignment problem with m rows and n columns will involves a total of m x n possible assignments
- an unbalanced assignment is one where the number of rows is more than, or less than the number of columns
- balancing any unbalanced assignment problem involves adding one dummy row or column
Correct answer: (C)
an unbalanced assignment is one where the number of rows is more than, or less than the number of columns
144. A game is said to be fair if ______________.
- lower and upper values are zero
- only lower value to be zero
- only upper value to be zero
- lower and upper values are not equal to zero
Correct answer: (A)
lower and upper values are zero
145. Which of the following is not a part of holding (or carrying) costs?
- Rent for storage space
- Extra expenses for an overnight express mail.
- Spoilage costs
- Electricity and heat for the buildings
Correct answer: (B)
Extra expenses for an overnight express mail.
146. The area bounded by all the given constraints is called ______________.
- feasible region
- basic solution
- non feasible region
- optimum basic feasible solution
Correct answer: (A)
feasible region
147. When D=18000, holding cost=Rs.1.20, set-up cost=Rs.400 ,EOQ = ______________
- 3465
- 3750
- 3500
- 4000
Correct answer: (A)
3465
148. Given arrival rate = 15/hr, service rate = 20/hr, the value of traffic intensity is ______________.
- 3/4
- 4/3
- 3/5
- 4/5
Correct answer: (A)
3/4
149. An activity is critical if its ______________ float is zero
- total
- free
- independent
- interference
Correct answer: (A)
total
150. ______________ is employed in construction and business problems
- Queue
- Replacement
- CPM
- PERT
Correct answer: (D)
PERT