Operations Research
51. In the basic EOQ model, if the lead time increases from 2 to 4 days, the EOQ will ______________
- double increase
- remain constant
- but not double
- decrease by a factor of two
Correct answer: (B)
remain constant
52. When the sum of gains of one player is equal to the sum of losses to another player in a game, this situation is known as ______________.
- two-person game
- two-person zero-sum game
- zero-sum game
- non-zero-sum game
Correct answer: (C)
zero-sum game
53. In the network, one activity may connect any ______________ nodes
- 1
- 2
- 3
- 4
Correct answer: (B)
2
54. Graphical method is also known as ______________.
- Simplex Method
- Dual Simplex Method
- Big-M Method
- Search-Approach Method
Correct answer: (D)
Search-Approach Method
55. If the given Linear Programming Problem is in its standard form then primal-dual pair is ______________.
- symmetric
- un symmetric
- square
- triangle
Correct answer: (B)
un symmetric
56. The method used to solve Linear Programming Problem without use of the artificial variable is called ______________.
- Simplex Method
- Big-M Method
- Dual Simplex Method
- Graphical Mehtod
Correct answer: (C)
Dual Simplex Method
57. When the total demand is equal to supply then the transportation problem is said to be ______________
- balanced
- unbalanced
- maximization
- minimization
Correct answer: (A)
balanced
58. For finding an optimum solution in transportation problem ______________ method is used.
- Simplex
- Big-M
- Modi
- Hungarian
Correct answer: (C)
Modi
59. Linear Programming Problem is a technique of finding the ______________.
- optimal value
- approximate value
- initial value
- infeasible value
Correct answer: (A)
optimal value
60. Any solution to a Linear Programming Problem which also satisfies the non- negative notifications of the problem has ______________.
- solution
- basic solution
- basic feasible solution
- feasible solution
Correct answer: (D)
feasible solution