Operations Research

51. In the basic EOQ model, if the lead time increases from 2 to 4 days, the EOQ will ______________

  1. double increase
  2. remain constant
  3. but not double
  4. decrease by a factor of two
Correct answer: (B)
remain constant

52. When the sum of gains of one player is equal to the sum of losses to another player in a game, this situation is known as ______________.

  1. two-person game
  2. two-person zero-sum game
  3. zero-sum game
  4. non-zero-sum game
Correct answer: (C)
zero-sum game

53. In the network, one activity may connect any ______________ nodes

  1. 1
  2. 2
  3. 3
  4. 4
Correct answer: (B)
2

54. Graphical method is also known as ______________.

  1. Simplex Method
  2. Dual Simplex Method
  3. Big-M Method
  4. Search-Approach Method
Correct answer: (D)
Search-Approach Method

55. If the given Linear Programming Problem is in its standard form then primal-dual pair is ______________.

  1. symmetric
  2. un symmetric
  3. square
  4. triangle
Correct answer: (B)
un symmetric

56. The method used to solve Linear Programming Problem without use of the artificial variable is called ______________.

  1. Simplex Method
  2. Big-M Method
  3. Dual Simplex Method
  4. Graphical Mehtod
Correct answer: (C)
Dual Simplex Method

57. When the total demand is equal to supply then the transportation problem is said to be ______________

  1. balanced
  2. unbalanced
  3. maximization
  4. minimization
Correct answer: (A)
balanced

58. For finding an optimum solution in transportation problem ______________ method is used.

  1. Simplex
  2. Big-M
  3. Modi
  4. Hungarian
Correct answer: (C)
Modi

59. Linear Programming Problem is a technique of finding the ______________.

  1. optimal value
  2. approximate value
  3. initial value
  4. infeasible value
Correct answer: (A)
optimal value

60. Any solution to a Linear Programming Problem which also satisfies the non- negative notifications of the problem has ______________.

  1. solution
  2. basic solution
  3. basic feasible solution
  4. feasible solution
Correct answer: (D)
feasible solution
Page 6 of 22