81. ______________ is a series of related activities which result in some product or services.
Network
transportation model
assignment
none of these
Correct answer: (A) Network
82. Constraint in LP problem are called active if they
Represent optimal solution
At optimality do not consume all the available resources
Both of (a) and (b)
None of the above
Correct answer: (A) Represent optimal solution
83. It ______________ at which an activity can start.
EST
EFT
LST
LFT
Correct answer: (A) EST
84. ______________ is the time by which the completion of an activity can be delayed beyond its earliest finish time without affecting the earliest start time of a succeeding activity
Slack
Total float
Free float
Independent float
Correct answer: (C) Free float
85. ______________ is the duration by which an activity can be delayed without delaying the project.
Total float
Slack
Earliest event time
None of these
Correct answer: (A) Total float
86. For decision making under uncertainty, identify the decision rule that is appropriate for the optimist.
Laplace
Maximax
Minimax regret
Maxmin
Correct answer: (B) Maximax
87. Opportunity loss refers to
The expected value of a bad decision
The expected loss from a bad decision
The difference between actual pay off and the optimal pay off
The regret from not having made a decision
Correct answer: (C) The difference between actual pay off and the optimal pay off
88. Which of the following criterion is not used for decision making under uncertainty?
Maximin
Maximax
Minimax
Minimize expected loss
Correct answer: (D) Minimize expected loss
89. The initial solution of a transportation problem can be obtained by applying any known method. But the only condition is
The solution be optimal
The rim conditions are satisfied
The solution not be degenerate
All of the above
Correct answer: (B) The rim conditions are satisfied