Production and Operations Management
11. Which kind of defect can be called as minor defect?
- Which does not reduce the usability of the product for its intended use
- The cost of repairing the defect is less
- Both (A) and (B)
- None of the above
Correct answer: (A)
Which does not reduce the usability of the product for its intended use
12. General Electric Matrix is divided into how many cells
- 4
- 9
- 16
- 25
Correct answer: (B)
9
13. What is the reason of excessive friction between parts?
- Improper or lack of lubrication
- Material of parts
- both (A) and (B)
- None of above
Correct answer: (A)
Improper or lack of lubrication
14. Capacity decisions have a direct influence on performance of production system in respect of –––––––––
- Delivery performance
- Quality control
- Plant size
- Manpower
Correct answer: (A)
Delivery performance
15. Business is rated on which dimensions
- Market attractiveness
- Business strength
- both (A) and (B)
- none of the above
Correct answer: (C)
both (A) and (B)
16. Which of the following policies is advisable in case of low product variety and large volumes?
- Skilled labour, special purpose machines
- Low skilled labour, general purpose machine
- Low Skilled Labour, Special Purpose Machines
- Any of the above
Correct answer: (C)
Low Skilled Labour, Special Purpose Machines
17. In an organization there may not be a formal PPC department if
- Work is highly repetitive in nature
- Planning activities are performed by the line staff
- Number of workmen is not very large
- All of the above
Correct answer: (D)
All of the above
18. 'W' in SWOT stands for
- What do you do well?
- What could you improve?
- What doors are open to you?
- What threats could harm you
Correct answer: (B)
What could you improve?
19. Which kind of labour force is required in case of Jobbing Production?
- Highly Skilled
- Semi skilled
- Unskilled
- Any of the above
Correct answer: (A)
Highly Skilled
20. Which of the following is not the characteristic of Project Production?
- Continuous flow of material
- Highly mechanised material handling
- Virtually zero manufacturing cycle time
- All of the above
Correct answer: (D)
All of the above