491. The process of monitoring specific project results to determine if they comply with relevant quality standards is called:
Quality Assurance
Quality Control
Quality Planning
Quality Review
Correct answer: (B) Quality Control
492. What percentage of sales is estimated to be the cost of non-quality?
3-5%
12-20%
30-40%
6-8%
Correct answer: (B) 12-20%
493. The zero defects concept
is a performance standard for management
is a motivational technique that promotes "doing it right the first time"
is used by management to communicate to all employees that everyone should do things right the first time
A and C
B and C
Correct answer: (D) A and C
494. If the acceptance sampling attribute for a lot is 30%, this means that
30% of all lots must be tested
30% of all lots must pass the test
any given lot must have 30% or fewer defects
a sample of a given lot must have 30% or fewer defects to pass the entire lot
C and D
Correct answer: (D) a sample of a given lot must have 30% or fewer defects to pass the entire lot
495. Which of the following statements regarding quality is false?
Quality improvements depends upon better definition and increased awareness of the requirements specifications
Future gains in quality will often rely on advanced technology
Recognition of key actions required of each team member is necessary to meet quality objectives
Computer-aided design systems can improve quality, but only a the expense of an increase in the cost of design
A and C
Correct answer: (B) Future gains in quality will often rely on advanced technology
496. Quality is often influenced by all of the following except:
fabrication processes and methods
supervision
inspection
cost of materials
design
Correct answer: (C) inspection
497. From the project perspective, quality attributes:
are used to determine how effectively the performing organization supports the project
can be objective or subjective in nature
are specific characteristics for which a product is designed, built, and tested
B and C
A and B
Correct answer: (D) B and C
498. Primary responsibility for quality management in the project rests with the:
project engineer
purchasing agent
quality manager
project manager
company president
Correct answer: (D) project manager
499. The cost of quality has been argued as being primarily driven by the workers. When items were produced that did not meet the customers' expectations, the workers were "found" to be at fault. Current thinking is that management has at least ______________ percent of the responsibility for the cost of quality.
85
75
65
55
50
Correct answer: (A) 85
500. The technical performance of the project is derived from the quality program instituted by the project manager. Quality control is one part of the uality program that ______________.
defines requirements and performance standards
measures results of operations
compares measured results to performance standards