31. A maturity model can be used as a benchmark for comparison and as an aid to understanding
TRUE
FALSE
depends
can't say
Correct answer: (A) TRUE
32. fourteen points framework for quality and productivity improvement was suggested by ______________
Crosby
Ishikawa
Deming
Juran
Correct answer: (C) Deming
33. Juran's Quality trilogy emphasizes the roles of quality planning, quality control and ______________
Quality Definition
Quality enhancement
Quality improvement
quality maintenance
Correct answer: (C) Quality improvement
34. Quality Circles members are ______________
Paid according to their contribution to quality
External consultants designed to provide training in the use of Quality tools
Always machine operators
None of the three.
Correct answer: (D) None of the three.
35. Identify the cost not likely to reduce as a result of better quality.
Maintenance costs
Inspection costs
Scrap costs
Warranty and service costs
Correct answer: (A) Maintenance costs
36. Costs of dissatisfaction, repair costs, and warranty costs are elements of cost in the ______________
Taguchi Loss Function
Pareto Chart
ISO 9000 Quality Cost Calculator
Process Chart
Correct answer: (A) Taguchi Loss Function
37. Kaizen is a Japanese term meaning ______________
continuous improvement
Just-in-time (JIT)
a fishbone diagram
setting standards
Correct answer: (A) continuous improvement
38. Quality management includes forming and directing a team of people to achieve a qualitative goal within an effective cost and time frame that results in ______________
a project completed in shortest possible time.
a product or service that conforms to the required specifications.
an award-winning product that brings public recognition to the project
an innovative project that establishes qualification of the project team
Correct answer: (B) a product or service that conforms to the required specifications.
39. establishing measurements based on customer needs for optimizing product design is known as ______________
Quality planning
quality improvement
quality control
Quality planning (Actual answer is Quality planning roadmap)